Web1 day ago · In accordance with 40 CFR 3.1000(d), ... Part 123: EPA-Administered Permit Programs: the National Pollutant Discharge Elimination System (NPDES) Reporting under 40 CFR 122 and 125. NJDEP was notified of EPA's determination to approve its application with respect to the authorized programs listed above. Start Signature ... Web1 day ago · Reporting under 40 CFR 122 and 125. NJDEP was notified of EPA’s determination to approve its application with respect to the authorized programs listed above. ... Registration Review at 40 CFR part 155, subpart C. Section 3(g) of FIFRA provides, among other things, that the registrations of pesticides are to be reviewed …
40 CFR Subchapter D - WATER PROGRAMS CFR US Law LII / …
Web(45) § 122.36 (As an operator of a regulated small MS4, what happens if I don't comply with the application or permit requirements in §§ 122.33 through 122.35?); and (46) 40 CFR part 3 (Cross-Media Electronic Reporting Regulation) and 40 CFR part 127 (NPDES Electronic Reporting Requirements). (47) For a Great Lakes State, § 122.38. WebJun 16, 2024 · Establishing limitations, standards, and other permit conditions (40 CFR Part 122.44(j)(2)(ii)) (PDF) (8 pp, 268 K) POTWs impose local limits at the end-of-pipe discharge from an industrial user (i.e., at the point of connection to the POTW's collection system). harrington co living at the mansfield
National Pollutant Discharge Elimination System (NPDES) US EPA
WebApr 13, 2024 · Additionally, Sec. 3.1000(b) through (e) of 40 CFR part 3, subpart D provides special procedures for program revisions and modifications to allow electronic reporting, to be used at the option of the state, tribe or local government in place of procedures available under existing program-specific authorization regulations. Web(ii) For point-source discharges, monitoring shall be conducted in accordance with 40 CFR parts 122, 123 and 434 and as required by the National Pollutant Discharge Elimination System permitting authority. (3) The monitoring reports shall be submitted to the regulatory authority every 3 months. The regulatory authority may require additional ... WebUpon request of a permittee who qualifies for effluent limitations on a net basis under § 122.45(g). (ii) When a discharger is no longer eligible for net limitations, as provided in § 122.45(g)(1)(ii). (9) Pretreatment. As necessary under 40 CFR 403.8(e) (compliance schedule for development of pretreatment program). (10) Failure to notify. harrington colonial caravan park